Comments and Questions
There are no specific public comment periods open at this time. However, COMPASS always welcomes your comments and questions. Send questions and comments at any time to [email protected].
_______________________________________________________________________________________________________________
Connect with COMPASS!
Learn how you can connect with COMPASS to stay informed and have your voice heard.
_______________________________________________________________________________________________________________
-
- Amendment #12 to the regional long-range transportation plan, Communities in Motion 2050, amendment #9 to the FY2026-2032 Regional Transportation Improvement Program (TIP) and amendment #3 to the FY2027-2033 TIP
- Public Comments Verbatim
- Add a Canyon County vanpool pilot project and transit services to and near Micron, along with supporting transit facilities, including a “bus on shoulder” pilot project on Interstate 84. In addition, the proposal would change the scope of a widening project on State Highway 55 near Beacon Light Road and correct an error in the stated location of a pavement restoration project. Finally, it would make funding changes to projects along Interstate 84, State Highway 16, and State Highway 55 (Karcher Road).
- Amendment #11 to the regional long-range transportation plan, Communities in Motion 2050 (CIM 2050), amendment #8 to the FY2026-2032 Regional Transportation Improvement Program (TIP), and amendment #2 to the FY2027-2033 TIP
- Public Comments Verbatim (PDF)
- Add two projects to CIM 2050:
- Add an overpass at State Highway 16 connecting to Valnova Drive in Ada County.
- Add a study to extend State Highway 16 south of Interstate 84 to Bowmont Road south of the City of Nampa in Canyon County.
- Three additional projects are proposed to be added to the TIP that do not require an amendment to CIM 2050. In addition, a significant reduction in the scope and cost of an existing study is proposed.
- Add a comprehensive funding and financing strategy study for restoring intercity passenger rail along the Pioneer Corridor.
- Add a corridor-level planning and design project for an extension of Lake Hazel Road in the City of Boise.
- Add a three-part connectivity and safety improvement project on the Northside Corridor in the City of Nampa.
- Remove funding and decrease the scope of a study to extend State Highway 69 (Meridian Road) south of the City of Kuna. The funding would be moved to the State Highway 16 extension project (above).
- Proposed amendment #10 to the long-range transportation plan, Communities in Motion 2050, and the DRAFT FY2027-2033 Transportation Improvement Program
- Amendment #6 to the FY2026-2032 Regional Transportation Improvement Program (TIP)
- Public Comments Verbatim (PDF)
- The City of Nampa requested to increase the construction costs on an intersection improvement project at Northside Boulevard and Karcher Road by almost $4.6 million to cover the final engineer’s estimate. The cost increase is due to the complexity of the project and accommodating double truck trailers near the Amalgamated Sugar factory.
- Amendment #9 to the regional long-range transportation plan, Communities in Motion 2050, Amendments #4 and #5 to the FY2026-2032 Regional Transportation Improvement Program (TIP)
- Public Comments Verbatim (PDF)
- This amendment would significantly increase the cost of an existing project and add two projects.
- Proposed Cost Increase, Existing Project: The Idaho Transportation Department requested to increase the design costs on a project to
improve mobility along Interstate 84 in southern Idaho by $5 million to complete final design. An ongoing study will determine the
most effective locations and improvement types. - Proposed New Project: 43rd Street, Ustick Road to the Boise River Greenbelt, City of Garden City (Ada County Highway District). Add a
project to purchase right-of-way for a future project to rehabilitate the roadway and improve pedestrian and bicycle travel. - Proposed New Project: Swan Falls Bridge (Ada County Highway District). Add a project to design a bridge over Indian Creek and the
Union Pacific Railroad in the City of Kuna.
- Proposed Cost Increase, Existing Project: The Idaho Transportation Department requested to increase the design costs on a project to
- Amendment #12 to the regional long-range transportation plan, Communities in Motion 2050, amendment #9 to the FY2026-2032 Regional Transportation Improvement Program (TIP) and amendment #3 to the FY2027-2033 TIP